New Abet Laminate Door Collection available now  

bc36409d-da4f-4353-87cc-9aa3e2d463a4Abet have launched a new range of 33 colour options together with 14 woodgrains all offered in standard sizes up to 2250 x 1000mm,  laminate colour swatches can be also sent out within 24 hours notice.

The Abet range fits nicely alongside BIBC’s Polyrey and Formica standard laminate ranges.

To download a copy of the Abet link, please click here.

Gallery Updated

galleryThe BIBC website has a large collection of project examples which highlights the large selection of bespoke products BIBC can manufacture.

The latest additions are the Washington and Tamworth Leisure Centres.

The most recent projects can be found here

BIM Data available for download

In preparation for the forthcoming Government legislation in 2016 that states all public contracts are to be run to a BIM level 2 standard, Bridgman have launched a series of pre-hung doorsets that have level 2 BIM data. The go ahead door manufacture based at 10000ft premises in Hartlepool, will be able to supply the data in a format to suit the end user which includes Industry Foundation Classes (IFC) and the data for Construction Operations Building Information Exchange (COBie).

The models are free to download and are also supported by RIBA NBS Plus scheme which will take the hassle out of specification for FD30 and FD60 pre-hung / doorsets. Bridgman cubicles ranges is also available to download.

To access the BIM models, please visit the Bridgman web site, www.staging2.inspirar.co.uk/bridgman or email s.hind@staging2.inspirar.co.uk/bridgman for password / access.

CE Marking

44821c2e-5af8-4ef5-a132-1c516d837b7dCE Marking

10th July 2015 marks a milestone for the Fire doorset industry, as the standard for fire doorsets EN 16034 was officially entered into the Official Journal of the European Union.

This entry will finally allow the CE marking of fire doorsets, windows, garage and Industrial door.

CE marking of fire doorsets can start from 1st December 2015 and there will subsequently be a 3 year transition period for manufacturers to achieve compliance.

BIBC will shortly embarking on a series of tests towards the new standards , with the first test due next month.